This week in AutoCAD our group has been brainstorming over building a ballista for warfare. The design has been thrown around, but is still in its early stages. The main issue at the moment is finding the right material for launching the tennis balls. A ballista offers more accuracy and quicker reloading time for ammunition. As for now we've all decided on a name for our kingdom, The Order.
Friday, October 25, 2013
Friday, October 18, 2013
Thursday, October 10, 2013
Week 8 - Hands Across America
This week in AutoCAD, we did not use AutoCAD instead we laid down some concrete in the base of the hydroponic garden. I personally saw to it that the concrete was smoothed to perfection. After the smoothing process was completed then came the challenging hand imprinting procedure. This involved well timed hand laying techniques and even distributed pressure along the hand it self.
Friday, October 4, 2013
Week 7 - Making Progress
This week our group has been taking care of business, the triangular base for the hydroponic garden has been partially completed. The triangular base allows for a sturdy structure and optimal H2O flow of the PVC piping. The hydroponic garden super structure is aerodynamically designed and engineered for excellence. The PVC piping is custom built to allow for maxim plant watering.
Subscribe to:
Posts (Atom)